Completed
Start-up / CommissioningMay, 2020
Capacity350 scfm (567 Nm³/hr raw biogas)
216 scfm (460 Nm³/hr rng)
Methane concentration in raw biogas50 – 65%
Methane concentration in product gas97%

Efficiency> 99%
Type installationPurePac Medium

Dane, Wisconsin (US)

Delivery of the RNG systems is part of a big revamp project from partner Martin Energy Group, which includes an overhaul on five existing digesters and replacing the CHP’s with Bright’s RNG technology.

This system will produces 216 scfm (460 Nm3/hr) of biomethane from 350 scfm (567 Nm3/hr) biogas, but can be extended in the future to produce more biomethane.

The produced biomethane is both directly injected into the national grid and transported trough a virtual pipeline. This technology allows to compress and transport gas by road and to deliver it at the right pressure and according to the demand from the consumers.

In addition to the production of biomethane, the system can also be extended with a Bright CO₂-liquefaction system to recover and liquefy the CO₂.