Completed
Start-up / CommissioningAugust 2019
Capacity900 Nm³/hr raw biogas
600 Nm³/hr biomethane
Methane concentration in raw biogas60%
Methane concentration in product gas89% (Dutch low-calorific gas, L-gas)

Efficiency99,5%
Type installationPurePac Grand

Den Hoorn, Netherlands

Bright Biomethane has built a biogas upgrading installation at the largest wastewater treatment plant in the Netherlands, one of the largest in Europe, situated in Den Hoorn. This is Bright Biomethane’s second installation for the same client. This versatile installation makes use of an innovative pretreatment system which delivers biogas to several processing systems – the biogas upgrading system, existing CHP and boiler, interchangeably or at the same time.

By utilizing the upgrading system, the biogas is upgraded to biomethane with capacity of 900 Nm3/hr. The produced biomethane is injected into the gas grid. Instead of low-calorific biomethane (L-gas), high-calorific biomethane (H-gas) can be also produced in the near future.

More information

Do you want to receive more information on our biogas upgrading technology or do you want to find out what Bright Biomethane can do for you? Don’t hesitate to contact us through [email protected] or call us on +31 (0)53 – 460 90 88.