Completed
Start-up / CommissioningFebruary, 2020
Capacity150 scfm (253 Nm³/hr) raw biogas
92 scfm (156 Nm³/hr) biomethane
Methane concentration in raw biogas50 – 65%
Methane concentration in product gas97%

Efficiency> 99.5%
Type installationPurePac Medium

Warsaw, New York (US)

Delivery of the RNG systems is part of a big revamp project from partner Martin Energy Group, which includes an overhaul on five existing digesters and replacing the CHP’s with Bright’s RNG technology.

This system produces 92 scfm (156 Nm3/hr) of biomethane from 150 scfm (253 Nm3/hr) biogas, but can be extended in the future to produce more biomethane.

The produced biomethane is injected into the national grid and is transported trough a virtual pipeline. This technology allows to compress and transport gas by road and to deliver it at the right pressure and according to the demand from the consumers.

In addition to the production of biomethane, the system can also be extended with a Bright CO₂-liquefaction system to recover and liquefy the CO₂.

More information

Do you want to receive more information on our biogas upgrading technology or do you want to find out what Bright Biomethane can do for you? Don’t hesitate to contact us through [email protected] or call us on +31 (0)53 – 460 90 88.