Completed
Start constructionApril 2017
Capacity770 Nm³/hr raw biogas
500 Nm³/hr biomethane
Methane concentration raw biogas58%
Methane concentration product gas> 89% (Dutch low calorific natural gas)
Efficiency99.5%

Tweede Exloërmond, Netherlands

In the north of the Netherlands Bright Biomethane has realised a biogas upgrading system with a capacity of 770 Nm³/hr biogas which is upgraded to 500 Nm³/hr biomethane.  In this same project the existing biogas installation, already running for 10 years, has been completely coverted / renovated. When the MEP-subsidy expired the owner decided to switch to upgrading of biogas to biomethane with natural gas quality. The biomethane is injected into the Dutch natural gas grid.

Bright Biomethane supplied the equipment for the renovation of the plant, the complete overhaul of the operating system and the biogas upgrading system. The project is ready by November 2017

More information

Do you want to receive more information on our biogas upgrading technology or do you want to find out what Bright Biomethane can do for you? Don’t hesitate to contact us through [email protected] or call us on +31 (0)53 – 460 90 88.