Completed
Start-up / CommissioningNovember 2018
Capacity800 Nm³/hr raw biogas (future: 1,200 Nm³/hr raw biogas)
600 Nm³/hr biomethane (future: 1,000 Nm³/hr biomethane)
Methane concentration in raw biogas55%
Methane concentration in product gasStandard: 97% without THT odorant directly supplied to neighbouring factory
Potential of: 89% with THT odorant supplied to national gas grid

Efficiency99,5%

Veendam, Netherlands

In this Veendam project, Bright Biomethane engineered for client ‘Bio-Energie Veendam’ a flexible, multifunctional biomethane system which easily alternate between two methane concentrations of the biomethane and with or without THT odorant injection. The product gas (biomethane) with 97% methane concentration without THT odorant is supplied directly to the neighbouring factory of magnesium salt producer Nedmag. Biomethane with a methane concentration of 89% with THT odorant can be supplied to the national gas grid to guarantee receipt of biomethane when Nedmag is not able to do so.

More information

Do you want to receive more information on our biogas upgrading technology or do you want to find out what Bright Biomethane can do for you? Don’t hesitate to contact us through [email protected] or call us on +31 (0)53 – 460 90 88.